{"id":36701,"date":"2025-03-04T14:44:52","date_gmt":"2025-03-04T14:44:52","guid":{"rendered":"https:\/\/247stiri.ro\/index.php\/2025\/03\/04\/termoenergetica-a-gasit-210-potentiale-surse-de-caldura-regenerabila-in-bucuresti-in-ce-procent-ar-putea-acestea-contribui-la-incalzirea-din-capitala\/"},"modified":"2025-03-04T14:44:52","modified_gmt":"2025-03-04T14:44:52","slug":"termoenergetica-a-gasit-210-potentiale-surse-de-caldura-regenerabila-in-bucuresti-in-ce-procent-ar-putea-acestea-contribui-la-incalzirea-din-capitala","status":"publish","type":"post","link":"https:\/\/247stiri.ro\/index.php\/2025\/03\/04\/termoenergetica-a-gasit-210-potentiale-surse-de-caldura-regenerabila-in-bucuresti-in-ce-procent-ar-putea-acestea-contribui-la-incalzirea-din-capitala\/","title":{"rendered":"Termoenergetica a g\u0103sit 210 poten\u021biale surse de c\u0103ldur\u0103 regenerabil\u0103 \u00een Bucure\u0219ti. \u00cen ce procent ar putea acestea contribui la \u00eenc\u0103lzirea din capital\u0103"},"content":{"rendered":"<p>\u00cen acest fel, Bucure\u0219tiul ar putea asigura 5% energie neconven\u021bional\u0103 \u00een cadrul sistemului de \u00eenc\u0103lzire centralizat\u0103, \u00een conformitate cu prevederile Directivei (UE) 2023\/1791 privind eficien\u021ba energetic\u0103.Preciz\u0103rile au fost f\u0103cute \u00een cadrul seminarului &#8216;Sprijinirea tranzi\u021biei energetice \u0219i a decarboniz\u0103rii \u00een sectorul termofic\u0103rii&#8217;, organizat de Compania Municipal\u0103 Termoenergetica.Adrian Untea a explicat c\u0103, potrivit directivei europene, p\u00e2n\u0103 \u00een anul 2050 sistemele de termoficare ar trebui s\u0103 se bazeze exclusiv pe surse de c\u0103ldur\u0103 regenerabil\u0103 \u0219i c\u0103ldur\u0103 rezidual\u0103. El a men\u021bionat c\u0103, \u00een cadrul proiectului Set Heat, a fost elaborat\u0103 harta termic\u0103 a Capitalei, pe care au fost indicate poten\u021biale surse de c\u0103ldur\u0103.&#8217;H\u0103r\u021bile termice reprezint\u0103 un instrument foarte util, deoarece pe harta localit\u0103\u021bii respective sunt suprapuse, pe coordonatele reale, poten\u021biale surse de c\u0103ldur\u0103. Acest instrument este \u00een continu\u0103 dezvoltare. \u00cen momentul de fa\u021b\u0103, \u00een Bucure\u0219ti s-au identificat 210 surse poten\u021biale de c\u0103ldur\u0103 regenerabil\u0103 \u0219i c\u0103ldur\u0103 rezidual\u0103, totaliz\u00e2nd aproximativ 187.000 de gigacalorii pe an. \u00cen ce prive\u0219te partea de energie regenerabil\u0103, la nivelul Municipiului Bucure\u0219ti s-au identificat: surse de energie solar\u0103 \u0219i c\u0103ldur\u0103 ce poate fi recuperat\u0103 din lacuri prin pompe de c\u0103ldur\u0103; exist\u0103 un poten\u021bial geotermal. Iar pe partea de c\u0103ldur\u0103 rezidual\u0103 s-au identificat p\u00e2n\u0103 \u00een prezent dou\u0103 solu\u021bii: recuperare de c\u0103ldur\u0103 de la sta\u021bii de metrou \u0219i de la cl\u0103diri unde exist\u0103 servere \u0219i, la fel, se genereaz\u0103 c\u0103ldur\u0103. Bine\u00een\u021beles, acestea implic\u0103 de asemenea introducerea unei pompe de c\u0103ldur\u0103&#8217;, a spus el.<\/p>\n<p><a title=\"Lucrari la termoficare, in plina iarna. Aproape 400 de blocuri din Bucuresti raman fara apa calda si caldura\" href=\"https:\/\/www.realitatea.net\/stiri\/actual\/lucrari-la-termifocare-in-plina-iarna-aproape-400-de-blocuri-din-bucuresti-raman-fara-apa-calda-si-caldura_6760026a4a2c9810ea53c8d2\">Lucr\u0103ri la termoficare, \u00een plin\u0103 iarn\u0103. Aproape 400 de blocuri din Bucure\u0219ti r\u0103m\u00e2n f\u0103r\u0103 ap\u0103 cald\u0103 \u0219i c\u0103ldur\u0103<\/a>Adrian Untea a men\u021bionat c\u0103 necesarul sistemului de termoficare din Bucure\u0219ti este de peste 3 milioane de gigacalorii, iar \u00een prezent au fost identificate aproximativ 5% poten\u021biale surse de energie neconven\u021bional\u0103. Dintre acestea, 91% reprezint\u0103 energie regenerabil\u0103, iar 9% c\u0103ldur\u0103 rezidual\u0103. Cea mai mare pondere o au panourile solare amplasate \u00een zona punctelor termice, iar p\u00e2n\u0103 \u00een prezent au fost identificate 198 de astfel de loca\u021bii.Coordonatorul proiectului Set Heat, Jacek Kalina, a declarat c\u0103 \u00een cadrul seminarului de la Bucure\u0219ti, desf\u0103\u0219urat \u00een perioada 4-6 martie, se vor formula propuneri pentru un model de lucru, bazat pe studiile realizate p\u00e2n\u0103 \u00een prezent.&#8217;Ce pot s\u0103 spun p\u00e2n\u0103 \u00een prezent este c\u0103 Bucure\u0219tiul are un poten\u021bial interesant \u00een vederea decarboniz\u0103rii. Urm\u0103rim obiectivele prev\u0103zute \u00een Directiva UE privind eficien\u021ba energetic\u0103. Potrivit acesteia, \u00een 2028 trebuie s\u0103 ave\u021bi cel pu\u021bin 5% energii regenerabile \u00een sistemul de \u00eenc\u0103lzire centralizat\u0103. Pute\u021bi s\u0103 spune\u021bi c\u0103 nu viza\u021bi atingerea acestui obiectiv, dar asta \u00eenseamn\u0103 c\u0103 nu ve\u021bi \u00eendeplini criteriile pentru un sistem eficient de \u00eenc\u0103lzire centralizat\u0103 \u0219i nu ve\u021bi fi eligibili pentru finan\u021b\u0103ri publice. Asta \u00eenseamn\u0103 c\u0103, dac\u0103 Bucure\u0219ti vrea s\u0103 ob\u021bin\u0103 finan\u021b\u0103ri europene, atunci trebuie s\u0103 s\u0103 conformeze acestui regulament&#8217;, a explicat Jacek Kalina.Potrivit acestuia, \u00eendeplinirea obiectivului de 5% nu este foarte dificil\u0103, \u00eens\u0103 p\u00e2n\u0103 \u00een 2035 trebuie s\u0103 se ajung\u0103 la un nivel de 35% energie neconven\u021bional\u0103, iar atingerea acestei \u021binte este ceva mai complicat\u0103.<\/p>\n<p><a title=\"Peste 460 de blocuri din Capitala raman FARA apa calda si caldura. Mii de bucuresteni vor fi nevoiti sa doarma in FRIG noptile urmatoare\" href=\"https:\/\/www.realitatea.net\/stiri\/actual\/peste-460-de-blocuri-din-bucuresti-raman-fara-apa-calda-si-caldura-anuntul-termoenergetica_67974d802836891eb0089db5\">Peste 460 de blocuri din Capital\u0103 r\u0103m\u00e2n F\u0102R\u0102 ap\u0103 cald\u0103 \u0219i caldur\u0103. Mii de bucure\u0219teni vor fi nevoi\u021bi s\u0103 doarm\u0103 \u00een FRIG nop\u021bile urm\u0103toare<\/a>&#8216;Asta \u00eenseamn\u0103 c\u0103 ve\u021bi avea nevoie de mult\u0103 tehnologie \u0219i resurse. Iar \u00een urm\u0103torii ani, \u00een 2040, \u00een 2045 \u0219i \u00een 2050, pragurile urc\u0103. Astfel, \u00een 2050 sistemul de \u00eenc\u0103lzire centralizat\u0103 trebuie s\u0103 se bazeze \u00een propor\u021bie de 100% pe energie regenerabil\u0103 \u0219i rezidual\u0103. \u00cen acest moment viz\u0103m 2035 \u0219i vedem c\u0103 \u00een acest an este dificil. Ave\u021bi nevoie de mult\u0103 tehnologie: tehnologii solare, biomas\u0103, incinerarea de\u0219eurilor, recuperarea c\u0103ldurii din diverse surse disponibile. Deci sistemul va avea mai multe surse \u0219i va necesita un control. Va avea nevoie de instrumente software, pentru a controla fluxul de energie. \u00cens\u0103, \u00een primul r\u00e2nd, este necesar\u0103 reabilitarea conductele de termoficare, aflate \u00eentr-o stare teribil\u0103. (&#8230;) De asemenea, este necesar\u0103 renovarea surselor de c\u0103ldur\u0103 pe care le ave\u021bi&#8217;, a spus el.Directorul general al Companiei Municipale Termoenergetica Bucure\u0219ti (CMTEB), Adrian Teodorescu, a declarat la r\u00e2ndul lui c\u0103 proiectul Set Heat vizeaz\u0103 tranzi\u021bia energetic\u0103 \u0219i decarbonizarea sistemelor de termoficare. Acestea se pot realiza &#8216;doar prin integrarea unor surse regenerabile de c\u0103ldur\u0103&#8217; \u0219i reprezint\u0103 o provocare &#8216;extrem de complex\u0103, dar necesar\u0103&#8217;, a spus el.&#8217;Faptul c\u0103 suntem obliga\u021bi s\u0103 atingem ni\u0219te \u021binte care \u021bin de aceast\u0103 decarbonizare \u0219i de implementarea unor surse de energie regenerabil\u0103 constituie pentru noi o provocare. Sper\u0103m ca to\u021bi actorii implica\u021bi \u00een realizarea acestor proiecte &#8211; m\u0103 refer la realizarea SACET &#8211; precum \u0219i autorit\u0103\u021bile publice locale \u0219i guvernan\u021bii s\u0103 ne acorde tot suportul \u0219i s\u0103 putem s\u0103 ajungem s\u0103 implement\u0103m aceste proiecte, care constituie pentru noi o prioritate maxim\u0103&#8217;, a spus el.Proiectul LIFE22-SET_HEAT este coordonat de Silesian University of Technology din Gliwice \u0219i reune\u0219te un consor\u021biu format din 12 parteneri din cinci \u021b\u0103ri: Croa\u021bia, Lituania, Danemarca, Polonia \u0219i Rom\u00e2nia. Durata proiectului este de 36 de luni (octombrie 2023 &#8211; septembrie 2026).\u00a0<\/p>\n<p><a title=\"Avarie la CET Vest. Bucurestenii care locuiesc in Sectorul 6 nu mai au incalzire si apa calda\" href=\"https:\/\/www.realitatea.net\/stiri\/actual\/avarie-la-cet-vest-locuintele-din-sectorul-6-nu-mai-primesc-incalzire-si-apa-calda_67b3411ca289fc1ca8304ab2\">Avarie la CET Vest. Bucure\u0219tenii care locuiesc \u00een Sectorul 6 nu mai au \u00eenc\u0103lzire \u0219i ap\u0103 cald\u0103<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>\u00cen acest fel, Bucure\u0219tiul ar putea asigura 5% energie neconven\u021bional\u0103 \u00een cadrul sistemului de \u00eenc\u0103lzire&hellip;<\/p>\n","protected":false},"author":0,"featured_media":36702,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-36701","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actual"],"_links":{"self":[{"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/posts\/36701","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/comments?post=36701"}],"version-history":[{"count":0,"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/posts\/36701\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/media\/36702"}],"wp:attachment":[{"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/media?parent=36701"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/categories?post=36701"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/247stiri.ro\/index.php\/wp-json\/wp\/v2\/tags?post=36701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}